Solar power
The Pokrovska Solar Power Plant (240 MW) is the second-largest solar farm in Europe by installed capacity. The solar farm in the Dnipropetrovsk region will provide 200 thousand households with clean energy, which will help reduce CO2 emissions and strengthen Ukraine's energy independence. The Pokrovska SPP will generate annually 400 mln kWh of green electricity, which is enough to supply 200 thousand private households. The solar farm helps reduce CO2 emissions into the atmosphere by 420 thousand tons per year, which is comparable to the emissions generated by more than 200 thousand cars. The Pokrovska SPP is a project implemented by Ukrainian companies and specialists. 16 enterprises took part in the construction and supplied services and products with a total contract value of 48 million Euros. It took only 8 months from the start of the construction works to the commissioning of the facility. The solar power plant began generating green electricity in October 2019. The Pokrovska SPP consists of 840 thousand solar panels supplied by Risen (China), one of the TOP-3 leading solar panel manufacturers according to Bloomberg market data. The SPP is located in the Nikopol district on the territory of a former mining quarry (437 hectares).
Address
Dnipropetrovsk oblast
Potential projects
Solar power
“Radomyshl” project includes construction of Solar Power Station with peak capacity of 9 MW (1st stage) on 6 ha land plot in Zhytomyr region, Northern Ukraine
Address
Zhytomyr oblast
Potential projects
Other
In 2019, Biogas-Ukraine commissioned the first stage of the biogas-energy complex for electricity generation. The gas generators made by Austrian company Jenbacher are installed as power generating equipment. Each engine is capable of producing 1,067 MW of electric energy and 1,202 MW of thermal energy. At the moment two engines are installed, and by the end of 2019, one engine will still be installed. In 2020, it is planned to install the last 4th engine, then the maximum thermal power will be 4,8MW. This project involves the construction of a heat supply network for the transportation of heat energy to the district heating system of the Shevchenko branch of the Misky Teplovi Merezhi (City Heating Grids) company in Zaporizhzhya city.
Address
Zaporizhzhia oblast
Potential projects
Solar power
The project is envisaged the construction of a solar power station with a capacity of 4 MW. Сadastral number to the land plot - 7321584900: 02: 005: 0120. The land plot area - 7.7862 hectares. Purpose - "Lands for the placement, construction, operation and maintenance of buildings and structures of objects of energy-generating enterprises, institutions and organizations" (IEC code 14.01). The property is communal
Address
Chernivtsi oblast
Potential projects
Solar power
The project is envisaged the construction of a solar power station with a capacity of 60 MWh/ year in the Volodymyrets village, Rivne region. The project goal is to produce 66.42 GWh of green energy per year and further sell it to the general wholesale electricity market at a feed-in tariff
Address
Rivne oblast
Potential projects
Biomass
In the framework of the project, it is envisaged the construction of the complex for sorting biodegradable (organic) part of municipal solid waste (MSW) as well as the construction of Thermal Power Plant (TPP) with the capacity of 6 MW with the following sale through feed-in tariff in Cherkasy city. Feedstock for TPP: organic part of MSW. Sorting complex capacity is about 100 000 ton per year that include 65000 ton of organic waste and 30 (35)000 ton of recyclable materials. The organic part of MSW will be burned in a steam boiler, produced by “Hurst Boiler & Welding Co. Inc.” (USA). Obtained steam is sent to a steam turbine to generate electricity. Technical indicators: capacity 6000 kW/hr, annual operation time 8400 hours, annual electricity generation 50400000 kW, annual electricity sales at feed-in tariff 47040000 kW, annual sales of ash as fertilizer 3877 ton. Annual greenhouse gas emission reductions of about 45000000 m3. It is developed the own WSW sorting technology
Address
Cherkasy oblast
Completed projects
Solar power
Співробітниками ТОВ «ЕДС-ІНЖИНІРИНГ» був реалізований проект - будівництво сонячної електростанції (СЕС) потужністю 2 МВт в місті Підгородне Дніпропетровської області. СЕС дозволить власнику виробляти екологічно чисту електричну енергію з подальшою реалізацією за зеленим тарифом, встановленим в Україні. Були виконані наступні роботи: • оформлення документів для дозволу будівництва та узгодження підключення до електромереж; • розробка проектної технічної документації, проведення вишукувальних робіт; • підбір, покупка і транспортування на місце майбутньої СЕС необхідного обладнання; • реалізація монтажно-будівельних робіт; • реалізація повного комплексу пусконалагоджувальних робіт.
Address
Dnipropetrovsk oblast
Potential projects
Solar power
Land plot cadastral number: 3225510100:10:013:0004. Total area: 31 hectares. Property type: сommunal. Land plot purpose: 14.01 For placement, construction, operation and maintenance of buildings and structures of objects of energy-generating enterprises, institutions and organizations
Address
Kyiv oblast
Potential projects
Under construction of objects REE
Accommodation: Dnipropetrovsk region, Mezhivskyi district, Mezhova. Status: Land plot lease for 49 years. Realization: Sale of lease rights. Land plot area: 189,5883 ha. Land use designation: 14.01 - for the location, construction, operation and maintenance of buildings and construction of power generating facilities, institutions and organizations. Cadastral numbers: 1222687700:01:002:0345; 1222687700:02:002:0434; 1222687700:02:002:0453. The project technical specifications for 100 MW is under approval by NEK “UKRENERGO”. The technical specification realization cost is 6 000 000 EURO. Project for auction.
Address
Dnipropetrovsk oblast
Potential projects
Under construction of objects REE
Accommodation: Dnipropetrovsk region, Mezhivskyi district, Mezhova. Status: Rent. Land lease for 49 years. Realization: Sale of lease rights. Land plot area: 18,5621 ha. Land use designation: 14.01 - for the location, construction, operation and maintenance of buildings and construction of power generating facilities, institutions and organizations. 9.9 MW technical specification project is under approval by DTEK. Cadastral numbers: 1222655100:03:002:1011; 1222655100:03:002:1012. Cost: 350 000 Euro
Address
Dnipropetrovsk oblast