Staryi Sambir Wind Power Station - 1
General Information
Completed projects
Wind power
Location
Settlement town of Staryi Sambir
Region Lviv oblast
Total capacity
electrical, kWt
Stages
13200 Kwt
heat, kWT
Stages
0 Kwt
The Name of a Project's Promoter (enterprise/organization)
The Name of a Project's Promoter (enterprise/organization) Eco-Optima, LLC
The Type of promoter Commercial project
Website http://www.ecooptima.com.ua/projects/vitroelektrostantsiya-stariy-sambir-ves-1/
Contact details 12/9 Sichovyh Striltsiv Str., Lviv, Ukraine 79007 tel.: +38 (032) 261 07 76, fax: +38 (032) 261 06 50 e-mail:info@ecooptima.com.ua
Project details
The current stage of project development Operating
Project description The first wind farm was constructed on a mountainous area of western Ukraine. The station comprises 4 wind turbines V112-3.3 by Danish company Vestas with a unit capacity of 3300 kW, 119-meter-high tower,112-meter rotor diameter arrayed on the 1.87 hectares area. The power station was commissioned in two stages: Stage 1 - in December 2014, the capacity of 6.6 MW, stage 2- in September 2016 - the capacity of 6.6 MW. In 2017 the electricity generation was 35, 085 million kWh. The installed capacity is 13.2 MW
Date of filling 2011