Thermal Power Plant on biomass in Cherkasy
General Information
Potential projects
Biomass
Location
Settlement Cherkasy
Region Cherkasy oblast
Total capacity
electrical, kWt
Stages
6000 Kwt
heat, kWT
Stages
0 Kwt
The Name of a Project's Promoter (enterprise/organization)
The Name of a Project's Promoter (enterprise/organization) "Sater-EcoEnergo group of companies ", LLC
The Type of promoter Commercial project
Contact details Dmytro Storozhuk, Chief Technology Officer, e-mail: dimdi22@gmail.com, tel.+38(066)350-38-58
Project details
The current stage of project development Under development
Project description In the framework of the project, it is envisaged the construction of the complex for sorting biodegradable (organic) part of municipal solid waste (MSW) as well as the construction of Thermal Power Plant (TPP) with the capacity of 6 MW with the following sale through feed-in tariff in Cherkasy city. Feedstock for TPP: organic part of MSW. Sorting complex capacity is about 100 000 ton per year that include 65000 ton of organic waste and 30 (35)000 ton of recyclable materials. The organic part of MSW will be burned in a steam boiler, produced by “Hurst Boiler & Welding Co. Inc.” (USA). Obtained steam is sent to a steam turbine to generate electricity. Technical indicators: capacity 6000 kW/hr, annual operation time 8400 hours, annual electricity generation 50400000 kW, annual electricity sales at feed-in tariff 47040000 kW, annual sales of ash as fertilizer 3877 ton. Annual greenhouse gas emission reductions of about 45000000 m3. It is developed the own WSW sorting technology
Other Technical and Financial Documentation Feasibility study
Technology boilers, produced by «Hurst Boiler & Welding Co. Inc»
Project payback PI - 1.58; IRR - 22%; NPV - $9034000
Total investment
Euro 19720000 €
General Information
Annual power production kWh/year 50400000 Kwt
The type of financing source Loans, Grants, Private investments
The size (euro, %) and the source of existing or assumed debt 95%
Expenditure on construction of additional infrastructure costs for additional infrastructure construction are not required (available - access roads, substation)
The country of origin of prime equipment United States
Date of filling 19.11.2019