Settlement Petrykivka village Petrykivsky district
Region Dnipropetrovsk oblast
Total capacity
electrical, kWt
Stages
13596 Kwt
The construction project is envisaged three stages. It is possible to build by stages or full capacity
heat, kWT
Stages
0 Kwt
0
The Name of a Project's Promoter (enterprise/organization)
The Name of a Project's Promoter (enterprise/organization) "INKONI", LLC
The Type of promoter Commercial project
Contact details Andrii Teslenko, director, tel.+38(067)500-67-92; e-mail:teslenko.andrii@gmail.com
Project details
The current stage of project development Under development
Project description The project envisages construction of an industrial solar power plant on a land plot of 24 hectares. The land is divided into 3 parts for 3 equivalent projects. The generated electricity will be sold at a feed-in tariff. Estimated capacity of projects: Incon LLC - 4 842 kW; Treskon Ltd. - 4 514 kW; Inton LLC - 4 240 kW of solar generation. The number of solar panels (335 W): 40 585 pcs. The number of inverters: 7 pcs. Peak power: 13 596 kW. Annual output: 12, 430,000 kWh / year (AC)
Project implementation period 9 months
Available documentation land ownership; a detailed territory plan is developed, approved and agreed; geological studies were conducted (conclusions were obtained); technical conditions for connection to external grids (without linear component) is obtained
Approval Documentation Property Right to Land, Agreement on connection to the electricity grid, Construction permit, Others
Other Technical and Financial Documentation extract of land registry for land plot use with the designated purpose 14.01 "For placement, construction, operation, and maintenance of buildings and structures of energy-generating enterprises, institutions, and organizations"; in October 2018 the request for obtaining of "Environmental Impact Assessment" was sent; 3 legal entities were created to implement the project (registration date - October 2018)
Technology According to the developed master plan and technical parameters
Project payback 4 years
Total investment
Euro 8800000 €
Stages Stages: I - 4.52 MW, II - 4.84 MW, III - 4.2 MW
General Information
The type of financing source Loans, Grants, Private investments
The size (euro, %) and the source of existing or assumed debt 87,5
Date of filling 29.07.2019