Projects
list on map
Potential projects
Land for the cultivation of energy crops
Address
Zhytomyr oblast
Potential projects
Land for the cultivation of energy crops
Address
Cherkasy oblast
Potential projects
Solar power
Accommodation: Lviv region, Stryi district. Status: Rent. Land lease for 25 years. Realization: Sale of lease rights. Land plot area: 6.99 ha + 4.17 ha + 1.14 ha +5.85 ha +4.32 ha +3.37 ha = 25.8 ha. Land use designation: 14.01 - for the location, construction, operation and maintenance of buildings and construction of power generating facilities, institutions and organizations. Cadastral numbers: 4625385200:12:000:1013 (for land plot 6,99 ha). 4625385200:08:000:0703 (for land plot 4,17 ha). 4625385200:08:000:0701 (for land plot 1,14 ha). 4625385200:08:000:0706 (for land plot 5,85 ha). 4625385200:08:000:0704 ( for land plot 4,32 ha). 4625385200:08:000:0702 (for land plot 3,37 ha). Cost: 45 000 Euro / MW
Address
Lviv oblast
Potential projects
Solar power
SUNLIGHT ENERGO, LLC is a Ukrainian engineering company with the head office in Kyiv. The company is considering the construction of project of solar power plant and offers this project for attract investments: land plot (Figure 1) with a total area of 27.4414 ha, cadastral number 3524384200: 02: 000: 9033, location near Sukhiy Tashlyk village of Kirovograd region. Construction of Solar Power Plant (SPP) with calculated capacity of 12.6 MW
Address
Kirovohrad oblast
Completed projects
Biogas
The Kherson city landfill was put into operation in 1968. The landfill is located outside the settlement (distance 0,5 km from residential buildings, 1 km from Virovchyna river watercourse). Due to the constant transportation of new batches, its total quantity increases, as well as gas extraction. After the closure and reclamation of the MSW landfill, the organic part of the solid waste continues to decompose, producing landfill biogas. Basic output data used to calculate: • The beginning of the introduction of solid waste - 1968; • Imported in 2017 - 70 thousand tons of solid waste; • The accumulated amount of solid waste (data in 2017) - 4.0 million tons of solid waste; • The area of the landfill, occupied by solid waste – 30,8 hectares. • Waste storage height - 15-15.6 m Forms of cooperation with the investor: a public-private partnership
Address
Kherson oblast
Potential projects
Energy efficiency
Project Concept The Project goal is to decrease greenhouse gases emission resulted by fuel and power resources consumption reduction, city’s district heating system energy efficiency improvement. The above Project implementation will allow to shift from 4-pipes heat supply system to 2-pipes system, consequently all DHW distribution networks from Central Thermal Substations to DHW consumers will be decommissioned. Installation of TS for DHW will allow to abandon DHW networks operation, thus the above mentioned networks’ operational expenses will be decreased. Project brief summary: The Project foresees installation of automated module units for DHW preparation in existing buildings’ basements (heating networks inlet). Each building heat and DHW supply will be provided from existing external heating networks. Existing 4-pipes thermal inlet is located in basement premises, subject for TS premises rehabilitation. Project scope includes 130 TS for DHW assembled from state-of-art energy efficient equipment.
Address
Vinnytsia oblast
Completed projects
Biomass
The boiler house provides thermal energy and hot water to 50 residential buildings (13,000 inhabitants); 6 kindergartens; 6 schools. Raw materials: wood chips, pellets. Project cost: UAH 8.4 million. Commissioning: February 2017
Address
Khmelnytskyi oblast
Completed projects
Biogas
23 серпня 2018 року запущено І чергу проекту із дегазації полігону ТПВ із виробленням електроенергії. Проект дозволить зменшити викиди шкідливих речовин в повітря та виробляти близько 4 млн. кВт-год електроенергії щорічно. МІсто отримає 10% від доходів з продажу електроенергії за " зеленим" тарифом та 12 робочих місць. Річна кількість видобутку біогазу - 2,5 млн. м3 /рік ( заміщує 1,5 млн. м3 / рік газу). Загальний обсяг інвестицій 25 млн. гривень
Address
Khmelnytskyi oblast
Potential projects
Solar power
Accommodation: Dnipropetrovsk region, Synelnykivsky district, Pysarivka. Status: Private land plot. Realization: Realization by selling to the customer’s property. Land plot area: 28 ha. Land use designation: 14.01 - for the location, construction, operation and maintenance of buildings and construction of power generating facilities, institutions and organizations. Cadastral numbers: 1224886800:01:002:0382; 1224886800:01:002:0371; 1224886800:01:002:0370. Cost: 60 000 Euro/MW.
Address
Dnipropetrovsk oblast
Potential projects
Biomass
Purpose of the project: production of fuel briquettes using the latest technologies (production automation, control of the use of resources) in order to provide the population and enterprises with high-quality fuel pellets at a reasonable price. Implementation of the project will allow establishing cooperation between territorial communities by providing them with efficient environmentally friendly fuel, and in the future, possible deliveries of products throughout Ukraine. All this will help to save budget funds by reducing the cost of removal and disposal of wood waste and branches. Currently, 2 enterprises and 7442 residents of Novopskovskaya United Territorial Community use solid fuel boilers. In the near future, it is planned to transfer social institutions and communal enterprises to alternative heating. Raw-dried trees and overgrown trees, tree waste, cereal straw, sunflower husk, buckwheat husk, sawdust, cane and other vegetable waste
Address
Luhansk oblast