Projects
list on map
Completed projects
Solar power
Capacity: 2 MW. Land plot area: 4 ha. Construction period: 10.2018 — 03.2019. Start of generation: 04.2019. Technical indicators of SPS «ALANTA ENERGI»: Installed capacity of photovoltaic modules — 2,3 MW; Inverter capacity of station – 2,0 MW; The volume of annual electricity generation is 2518 MW/hour; CO2 reduction – 4377 tons; The number of “Jinko Solar” photovoltaic modules (PV modules) – 4200 pcs. with a capacity of 270 W; The number of “Talesun” photovoltaic modules (PV modules) – 3600 pcs. with a capacity of 325 W; The number of «Huawei» inverters – 50 pcs. 40 kW each; The number and power of EDS combiners — 6 units of 160 kW each; 6 units of 170 kW each; The number of transformer substations MODULE 1000/6/0,4 – 11 pcs. Type of works: Feasibility study design; Development of the design documentation; Supply of solar panels and inverter equipment; Supply of power and switchboard equipment; Construction and installation works; Connection of the constructed SPS to the grid; Member registration in WEM and “green” tariff approval; Service maintenance of SPS. Cost: 2 400 000 $
Address
Dnipropetrovsk oblast
Completed projects
Wind power

The purpose of the project:

The construction of the wind power plant (WPP) is aimed at producing electricity. Sales of electricity produced are carried out in the Wholesale market of electricity according to the “green” tariff.

Brief project description:

As for the end of 2015, 16 wind power installations with a capacity of 107.5 kW each were installed and connected and put into operation on the Syvash WWP site (production of the plant “Pivdenmash”, Dnipro, licensed by the US company Kenetec Windpower). Also, two wind power installation models T600-48 with a capacity of 600 kW each are installed and put into operation (production of the plant “Pivdenmash”, Dnipro, licensed by Belgian company TurboWinds).

Thus, currently, the total capacity of Syvash WWP is 2.92 MW.

Address
Kherson oblast
Potential projects
Land for the cultivation of energy crops
Address
Kyiv oblast
Completed projects
Solar power
October 3, 2019, UDP Renewables has launched its photovoltaic power plant Port-Solar in Izmail, Odesa region. PV PP Port-Solar, with a peak capacity of 8,6 MW, occupies ​16 ha. More than 25,700 solar panels made by Jinko Solar, the world’s biggest manufacturer of solar panels, have been installed at the facility. The photovoltaic power plant will produce around 11,830 MWh of electricity per year – enough to meet the needs of at least 3,200 households. The co-investor is a Slovak company E-Group. The general contractor is Metropoliya Group. The cost of equipment produced in Ukraine amounted to about UAH 72.4 million. The total amount of taxes is over UAH 3.26 million. 135 jobs have been created at Port-Solar. Port-Solar’s operation will allow reducing carbon dioxide emissions by 13,500 tons per year
Address
Odesa oblast
Potential projects
Energy efficiency
The Project goal is heating system reconstruction for buildings on Gonty str. 39, 41 and 43 including modular gas fired boiler house construction on Gonty str. 39 in Vinnytsia. The project envisages the construction of a boiler house without permanent residents. Thermal capacity of boiler house heat generating equipment: major equipment of modular boiler house under design – two boiler units Buderus Logano SK755 600 kW. Boiler house and TS designed automation system provides full control and protection towards designed boiler units operational parameters. Boiler house heating diagram foresees heat supply during heating season with the temperature schedule 95-70°С, heat output regulation – attribute-based, water pressure in return pipeline - 3,4 bar, heating agent pressure in heating network supply pipeline - 4,5 bar. The Project foresees the boiler units’ low-temperature corrosion protection by installing circulating-mixing pumps on boiler units to ensure heating agent temperature before the boilers not lower than 70ºС. Boiler house district pumps selection is provided to ensure heating network operation during heating season using one pump; pumps heading is selected with respect to boiler house equipment hydraulic losses to ensure pressure differential in heating network. Return water with temperature 34-70ºС is supplied to the boiler house, and is delivered to boiler units via heat exchanger and boilers’ circulating pumps, where its being heated to set temperature. District pump (one in operation, another in stand-by mode) delivers water via heat exchanger to heating network. At boiler house cold raw water inlet automatic pump station is installed to maintain cold water pressure before water treatment system, capacity 1,6 m³/h; to compensate temperature dilatations at heating agent heating two diaphragm type compensating vessels are installed in the boiler house. The Project foresees two boilers’ simultaneous operation. Designed boiler units are equipped with automation system, providing gas firing process protection, automatic control and technological process maintenance
Address
Vinnytsia oblast
Completed projects
Energy efficiency
Суть проекту: комплексна термореновація дитячого навчального закладу № 63 відповідно до європейських норм та стандартів Особливості проекту: влаштування геліосистеми для підігріву гарячої води в неопалювальний період, встановлення рекуператорів тепла
Address
Zhytomyr oblast
Completed projects
Hydropower

Purpose of the project:

Small Hydroelectric Power Plant (HPP) is aimed at electricity production. Sales of produced electricity are carried out in the Wholesale market of electricity according to the "green" tariff.
 

Brief project description:

Krasnokhutirska HPP (Southern Bug basin – Syniukha river, Syniukha village, Vilshanskiy district, Kirovohrad region) was built in 1955. The installed capacity is more than 3 MW.

Address
Kirovohrad oblast
Completed projects
Energy efficiency
Мешканці житлово-будівельного кооперативу у місті Чернівці утеплили свій багатоквартирний будинок. Кошторис робіт – 700 тис. грн, 342 тис. з яких відшкодовано Урядом через програму #ТепліКредити. Після модернізації і утеплення будівлі мешканці платять 17,22 грн за кв. м замість 27,45 грн за кв. м. Економія мешканців будинку на опаленні – майже 40 %
Address
Chernivtsi oblast