Projects
list on map
Potential projects
Energy efficiency
Given the significant wear and tear of the existing main and auxiliary equipment at the boiler house, a complete reconstruction of all boiler house equipment is envisaged, as well as the overhaul of the boiler house building and premises. Currently, boiler units with exceeded capacity, comparing with connected load, are used to provide hot water and district heating services. The reconstruction will allow not using powerful equipment, thus resulting in balancing district thermal energy production system. In the framework of the project it is envisaged the reconstruction of existing gas fired boiler house with 2 outdated boiler units ДКВР 4/13, which were commissioned in 1979. District load: Heating - 1,26 GCal/h; DHW - 0,16 GCal/h. Boiler house temperature chart is 95/70º С
Address
Vinnytsia oblast
Potential projects
Land for the cultivation of energy crops
Address
Ivano-Frankivsk oblast
Completed projects
Biogas

Purpose of the project:

Production of electricity from the biomass, which is generated from the municipal solid waste (MSW) at the landfill. Sales of produced electricity are carried out in the Wholesale market of electricity according to the "green" tariff.

Brief project description:

Biogas power plant produces electricity from the biomass, which is formed from the organic waste at the landfill near the village Glyboke in Boryspil district of Kyiv region. The project was implemented in 2013 with installed capacity of 1063 kW.

Address
Kyiv oblast
Completed projects
Wind power
The installed capacity of 1 stage of the wind and solar power plant is 4 MW of electric energy. Annual production of electric energy is 6,000 million kWh / year. The facility was put into operation on June 20, 2018
Address
Ternopil oblast
Potential projects
Solar power
The total capacity of the solar power plant - 25 MW; Possible annual electricity generation - 26.1 million kWh; Existing feed-in tariff in Ukraine for solar energy facilities - EUR 0.15 / kWh (excluding VAT); Estimated revenue will be 3.9 million euros per year (excluding VAT). The land plot for the energy object is 77.5 hectares; The direct distance from land plot to the power supply (110/35/10 kV Substation Pereginskaya) is 5 km
Address
Ivano-Frankivsk oblast
Completed projects
Energy efficiency

Назва проекту: Технічне переоснащення групової котельні ПОКВПТГ "Полтаватеплоенерго" по вул. Горбанівська, 2-К.

Суть проекту: впровадження енергоефективного обладнання на стадії процесу вироблення теплової енергії.

Результати впровадження проекту:

1. Досягнуто високих показників економічної ефективності реконструкції:

  • загальна вартість зекономлених енергоресурсів – 400,5 тис. грн;
  • річна економія природного газу в результаті технічного переоснащення – 208,6 тис. м3;
  • річна економія електроенергії в результаті реконструкції – 22,8 тис. кВт.

2. Значне скорочення викидів парникових газів в атмосферу.

Address
Kyiv oblast
Completed projects
Energy efficiency

Purpose of the project:

Implementation of energy saving measures in apartment building to reduce natural gas consumption by condominium residents (association of co-owners of a multi-apartment building).

Brief project description:

The condominimum "Zatyshok-2" that brings together 15 apartments residents (Ivano-Frankivsk, street S.Bandery, ap. 12B) has provided energy saving measures, namely building insulation and replacement windows and doors. Project was completed in 2015.

Source and amount of funds:

The project was implemented under the government energy efficiency program by providing credit facilities from AB "Ukrgasbank" totaling over 180 thousand UAH. The compensation on the part of credit facilities made nearly 72.3 thousand UAH.

 

Result of the project:

Natural gas consumption by condominium residents during the heating season was reduced by 28% after the project implementation.

Address
Ivano-Frankivsk oblast
Completed projects
Energy efficiency

The purpose of the project:

Implementation of energy efficiency measures and, consequently, reducing the cost of utilities (heating) for the condominium residents.

Brief project description:

Within the project of the condominium “Halytskoho-4”, which brings together 144 apartments of the house residents (Rivne, 4 Danyla Halytskoho st.), energy saving measures were carried out, namely, insulation of the house and replacement of windows. The project on energy saving measures was implemented in 2015.

Source and funding:

The project was implemented under the governmental programme for energy efficiency by providing the credit money of the bank “Oshchadbank” totaling more than 550.000 UAH with a compensation of nearly 375.400 UAH, including:

  • the cost of the insulation measures exceeded 498.000 UAH, the amount of compensation - about 348.700 UAH according to the Municipal Sustainable Development Programme of Rivne for 2015-2017 (co-funding 70/30);
  • the amount of credit to replace the windows was 52.700 UAH with 40% with a compensation under the governmental programme in the amount of approximately 26.700 UAH.

Result:

After implementing energy saving measures within the project, the cost of heating for the condominium residents decreased almost 2 times.

Address
Rivne oblast
Completed projects
Biogas
2,4 MW Biogas Power Plant. It is fed with sugar beet pulp and cow manure
Address
Chernihiv oblast