Wind power
Wind Power Plant construction was started in 2011. Novorossiysk WES is equipped with three turbines Vestas V-112 with the capacity of 3 MW each. The height of the oscillator is 94 meters. The diameter of the impeller is 112 meters. ABB provided the electrical equipment for electric substations
Address
Kherson oblast
Completed projects
Solar power
Capacity: 2 MW. Land plot area: 4.86 ha. Construction period: 02.2017 — 06.2017. Start of generation: 10.08.2017 Technical indicators of SPS "SUN ENERGI": Installed capacity of photovoltaic modules — 2,16 MW; Inverter capacity of station – 2,0 MW; The volume of annual electricity generation is 2454 MW/hour; CO2 reduction – 1702 tons; The number of “Jinko” photovoltaic modules (PV modules) – 8000 pcs. with a capacity of 270 W; The number of «SMA-25» inverters – 80 pcs. 25 kW each; The number of «SMA-10» inverters – 10 pcs. 200 kW each; The number of transformer substations 1000/6/0,4 – 11 pcs. Type of works: Development of the design documentation; Supply of power and switchboard equipment; Construction and installation works; Connection of the constructed SPS to the grid; Member registration in WEM and “green” tariff approval; Service maintenance of SPS. Cost: 2 400 000 $
Address
Dnipropetrovsk oblast
Potential projects
Solar power
In the framework of the project it is envisaged the reconstruction of the power system of the the specialized school of I-III degrees № 4 by installing a roof PV station. The roof area is 3200 m2. In the framework of the project it is envisaged the installation of three roof PV stations: on the roof of the specialized school of I-III degrees № 4, on the Palace of Sports roof (project's link (https://uamap.org.ua/en/pv-station-installation-on-the-palace-of-sports-roof) and on the Center for Culture and Leisure (project's link https://uamap.org.ua/en/pv-station-installation-on-the-center-for-culture-and-leisure) in Dobropillia. The total investment for the three projects is 202 974 euro
Address
Donetsk oblast
Completed projects
Wind power

The purpose of the project:

The construction of the wind power plant (WPP) is aimed at producing electricity. Sales of electricity produced are carried out in the Wholesale market of electricity according to the “green” tariff.

Brief project description:

The construction started in 2013. WPP “Stavky” is equipped with three turbines Vestas V-112 with a capacity of 3 MW each. The height of the axis of the generator is 94 meters. The diameter of the impeller is 112 meters.

Company ABB exercised the supply of modern electric equipment for the power substations

Address
Kherson oblast
Completed projects
Biogas

Purpose of the project:

Production of electricity from the biomass, which is generated from the municipal solid waste (MSW) at the landfill. Sales of produced electricity are carried out in the Wholesale market of electricity according to the "green" tariff.

Brief project description:

Biogas power plant produces electricity from the biomass, which is formed from the organic waste at the MSW Landfill number 5 in the village Pidhirtsi in Obukhiv district of Kyiv region. The project was implemented in two stages (2012 and 2014 years) with the total installed capacity of 2 126 кW.  The annual scope of electricity production Annual electricity production in 2015 reached 18.6 million kWh.

Biogas power plant at the MSW Landfill number 5 is the first power station in Ukraine, which produces electricity from organic waste that is sold to the Wholesale electricity market at the "green" tariff.

Address
Kyiv oblast
Potential projects
Solar power
The project is envisaged the construction of a solar photovoltaic power plant with a capacity of 6.6 MWh. The land plot is located in the Ivano-Frankivsk region, has an asphalt entrance. Infinity Energy Group - has been working in the field of renewable energy since 2013 and has extensive experience in the implementation of solar power plant construction projects
Address
Ivano-Frankivsk oblast
Potential projects
Solar power
In the framework of the project it is envisaged the reconstruction of the power system of the building of the general secondary education school of I-III degrees № 6 by installing a roof PV station. The roof area is 1000 m2. In the framework of the project it is envisaged the installation of two roof PV stations: on the Administrative Service Centre roof (project's link https://uamap.org.ua/en/pv-station-installation-on-the-administrative-service-centre-roof ) and on the general secondary education school of I-III degrees № 6 roof in Toretsk. The total investment for the three projects is 120 156 euro
Address
Donetsk oblast
Potential projects
Energy efficiency
There are 7200 street light points, including 6000 sodium lamps, which consume a lot of electricity, in Kamianets-Podilskyi city. For energy efficiency and reducing the power consumption of up to 60%, it is necessary to replace sodium lamps with energy-efficient LEDs with remote control
Address
Khmelnytskyi oblast
Completed projects
Solar power
Ukraine will increase the share of renewables in its energy mix thanks to a new solar plant in the Mykolaiv region in the south of the country financed by the EBRD and the Black Sea Trade and Development Bank (BSTDB). The 57.6 MW plant will be the EBRD’s and the BSTDB’s largest solar project in the country to date. Both lenders are financing the construction of the solar plant with parallel loans of €19.1 million each will be provided by the EBRD and the BSTDB to a specially created project company Ingulets Energo - 2 LLC. Upon the completion the new plant will be generating at least 65,000 MWh of renewable energy per year and help reduce annual CO2 emissions by approximately 40,000 tonnes. The investment is implemented under the EBRD’s €250 million Ukraine Sustainable Energy Lending Facility III (USELF III) framework.
Address
Mykolaiv oblast
Completed projects
Solar power
Address