The Name of a Project's Promoter (enterprise/organization) Solar-Farm -1, LLC; Kyiv city, 57, Lva Tolstogo Str.,
The Type of promoter Commercial project
Website https://renewables.dtek.com/ua/media-center/press/nikopol-spp-starts-green-electricity-generation-/
Contact details Solar-Farm -1, LLC is subsidiary of DTEK Renewables B.V.
Project details
The current stage of project development Operating
Project description On March,1,2019 the Nikopol Solar Power Plant (SPP) started producing green electricity. The power plant has already reached its full design capacity of 200 MW and feeds this electricity into Ukraine’s power grid. The 200 MW plant was built in less than a year. In April 2018 DTEK signed an agreement for the design and construction of 200 MW solar power plant with Chinese company CMEC (China Machinery Engineering Corporation). The first solar panel on the SPP site was installed in October 2018. The solar power plant was put into exploitation in January 2019. The Nikopol SPP consists of 750 thousand PV panels located on the former quarry site. These are low-yield lands, which cannot be farmed efficiently
Project implementation period 1 year
Technology solar panels - Trina Solar Limited
General Information
The country of origin of prime equipment China
Date of filling 21.03.2019