Construction of 6 MW Power plant on biomass (wood chips)
General Information
Potential projects
Biomass
Location
Settlement Dubrovytsya, Rivne region
Region Rivne oblast
Total capacity
electrical, kWt
Stages
6000 Kwt
One stage construction 6000 kW
heat, kWT
Stages
0 Kwt
The Name of a Project's Promoter (enterprise/organization)
The Name of a Project's Promoter (enterprise/organization) Sater-EcoEnergo LTD, Spectrum-Product PE
The Type of promoter Commercial project
Website https://www.sproduct.com.ua
Contact details Dmytro Storozhuk, Chief Technology Officer, e-mail: dimdi22@gmail.com, tel.+38(066)350-38-58
Project details
The current stage of project development Under development
Project description In the framework of the investment project, it is envisaged the construction and operation of a 6 MW TPP plant using biomass as fuel, in Dubrovytsya, Rivne region. The project plans to generate 6 MWe with its further sale at the feed-in tariff. The fuel for the TPP will be wood chips, sawdust, wood waste of which, by direct incineration in a boiler, produced by “Hurst Boiler & Welding Co. Inc.” (USA), we get steam and ash. Obtained steam is sent to a steam turbine to generate electricity. The total amount of wood chips for this project is about 75 200 tons per year, from them just 67 200 tons are quite enough for continuous work for 350 days for the 2300HP boiler
Project implementation period Construction period 18 months
Approval Documentation Lease of Land Plot
Other Technical and Financial Documentation Feasibility Study prepared
Technology equipment produced by Hurst Boiler & Welding Co. Inc. and R&R Beth
Project payback Payback period 4 years, Discounted payback period 5.3 years
Total investment
Euro 14000000 €
Stages One stage construction 6000 kW
General Information
Annual power production kWh/year 50400000 Kwt
Power price, UAH/MWh 0.1239 UAH
Investment Schedule (monthly or quarterly) У розробленому ТЕО
The size (euro, %) and the source of existing or assumed capital It is planned to attract 65-70% of loans, 5% of equity, searching investor for 30%
The type of financing source Loans, Grants, Private investments
The size (euro, %) and the source of existing or assumed debt Передбачається залучити 65-70% кредитних коштів
Expenditure on construction of additional infrastructure construction costs for additional infrastructure are not required (additional infrastructure is available - access roads, substation, engineering nets)
The country of origin of prime equipment United States
Date of filling 09.12.19