Construction of 6 MW Power plant on biomass (the organic/biodegradable part of the MSW)
General Information
Potential projects
Biomass
Location
Settlement Borodyanka district, Nemishaevo
Region Kyiv oblast
Total capacity
electrical, kWt
Stages
6000 Kwt
One stage construction 6000kW
heat, kWT
Stages
0 Kwt
The Name of a Project's Promoter (enterprise/organization)
The Name of a Project's Promoter (enterprise/organization) Sater-EcoEnergo LTD, Spectrum-Product PE
The Type of promoter Commercial project
Website https://www.sproduct.com.ua
Contact details Dmytro Storozhuk, Chief Technology Officer, e-mail: dimdi22@gmail.com, tel.+38(066)350-38-58
Project details
The current stage of project development Under development
Project description In the framework of the project, it is envisaged the construction of the complex for sorting biodegradable (organic) part of municipal solid waste (MSW) as well as the construction of Thermal Power Plant (TPP) with the capacity of 6000 kW with the following sale through feed-in tariff in Nimeshaevo. Feedstock for TPP: organic part of MSW. Sorting complex capacity is about 100 000 ton per year that include 65000 ton of organic waste and 30 (35)000 ton of recyclable materials. The organic part of MSW will be burned in a steam boiler, produced by “Hurst Boiler & Welding Co. Inc.” (USA). Obtained steam is sent to a steam turbine to generate electricity. Technical indicators: capacity 6000 kW/hr, annual operation time 8400 hours, annual electricity generation 50400000 kW, annual electricity sales at feed-in tariff 47040000 kW, annual sales of ash as fertilizer 3877 ton. Annual greenhouse gas emission reductions of about 45000000 m3. It is developed the own WSW sorting technology. Capacity 6000 kW/hr, annual operation time 8400 hours, annual electricity generation 50400000kW, annual electricity sales at "green" tariff 47040000kW, annual sales of ash as fertilizer 3877 ton
Project implementation period Construction period 18 months
Approval Documentation Lease of Land Plot
Other Technical and Financial Documentation Feasibility Study developed
Technology equipment produced by Hurst Boiler & Welding Co. Inc. and R&R Beth
Project payback Payback period 3.8 years, Discounted payback period 4.9 years;
Total investment
Euro 20050000 €
Stages One stage construction 6000kW
General Information
Annual power production kWh/year 50400000 Kwt
Power price, UAH/MWh 0.1239 UAH
Investment Schedule (monthly or quarterly) available in feasibility study
The size (euro, %) and the source of existing or assumed capital It is planned to attract 65-70% of loans, 5% of equity, searching investor for 30%
The type of financing source Loans, Grants, Private investments
The size (euro, %) and the source of existing or assumed debt Передбачається залучити 65-70% кредитних коштів
Expenditure on construction of additional infrastructure construction costs for additional infrastructure are not required (additional infrastructure is available)
The country of origin of prime equipment United States
Date of filling 06.12.19