Construction of Biomass Power Plant in Gorodnya town
General Information
Potential projects
Biomass
Location
Settlement Gorodnya town
Region Chernihiv oblast
Total capacity
electrical, kWt
Stages
7400 Kwt
1 stage
heat, kWT
Stages
0 Kwt
The Name of a Project's Promoter (enterprise/organization)
The Name of a Project's Promoter (enterprise/organization) LLC Gorodnyanskaya TPP
The Type of promoter Commercial project
Contact details Volodymyr Boyko; tel. +38(067)321-41-44; e-mail: vlboyko1972@gmail.com
Project details
The current stage of project development Ready for implementation
Project description The project is foreseen the construction of the Biomass Power Plant with a total capacity of 7.4 MW (1st stage) at 10 ha land plot in the town of Gorodnya, Chernihiv region for the further electricity sell at the feed-in tariff. If necessary, it is possible to build another two stages each of 7.4 MW. The main fuel is wood chips. The project is ready for implementation
Project implementation period 2019-2021
Available documentation 10 ha land plot with the designated purpose of "placing a generating object" in the property; project documentation for stage P has developed; tenders for the supply of basic equipment were conducted
Approval Documentation Property Right to Land
Other Technical and Financial Documentation technical conditions for connection to Chernigivoblenergo were agreed; a detailed plan of the territory has been developed and approved, all necessary public hearings have been held
Technology The biomass will be burned in the Xilo 25 mW (Lithuania) boiler; the steam turbine MAN (Germany) will be used to generate electricity. The installed capacity of the power plant is - 7.4 MW. Taking into account all losses, the net power will be 6.6 MW
Project payback 5 years
Total investment
Euro 18600000 €
General Information
Annual power production kWh/year 59496000 Kwt
Investment Schedule (monthly or quarterly) помiсячний
The type of financing source Loans, Private investments
The size (euro, %) and the source of existing or assumed debt 70
Expenditure on construction of additional infrastructure Included in the total project cost
The country of origin of prime equipment Lithuania
Date of filling 11.06.2019