Bardivska Hydro Power Plant
General Information
Completed projects
Hydropower
Location
Region Zhytomyr oblast
Total capacity
electrical, kWt
Stages
180 Kwt
heat, kWT
Stages
0 Kwt
The Name of a Project's Promoter (enterprise/organization)
The Name of a Project's Promoter (enterprise/organization) Zhytomyr Region Development Agency, address: 25, Mala Berdychivska Str., Zhytomyr
The Type of promoter Commercial project
Website http://zrda.org
Contact details Zhytomyr Region Development Agency Director - Artem Sachuk, e-mail: ceo@zrda.org, tel. +38 097 016 71 85
Project details
The current stage of project development Operating
Project description There is the autonomous control system based on the Luxor operating system at HPP. This system manages and controls the technological process: automatic start, stop, HPP emergency shutdown. This system also controls: headwater elevation; turbine speed; generator temperature; power generator parameters; locks and protection. The control system innovation is a DC power supply system of 24V (DC), which allows the turbine to be closed by a disk shutter with electrohydraulic actuator (DC24V) in case of emergency shutdowns of the network. HPP key technical characteristics: pressure H = 5.7 m; water supply Q = 4.2 m3 / s; generator: asynchronous AG, P = 180 kW, U = 0.4 kV, n = 428 rpm. Hydraulic turbine: T-90 piped, propeller horizontal type
Date of filling 23.08.2018