Land plot for 12 MW solar power plant placement in the Dnipropetrovsk region
General Information
Potential projects
Solar power
Location
Settlement Vasylkivskyi district, Pavlivka
Region Dnipropetrovsk oblast
Total capacity
electrical, kWt
Stages
12000 Kwt
Construction of the SPS is carried out in 2 stages
heat, kWT
Stages
0 Kwt
The Name of a Project's Promoter (enterprise/organization)
The Name of a Project's Promoter (enterprise/organization) EDS-Development, LLC
The Type of promoter Commercial project
Website https://eds-development.com/objects/zemlia-pid-soniachnu-elektrostantsiiu-12-mvt-v-dnipropetrovskii-obl/
Contact details Vitaliy Shakalo; e-mail: shakalo@eds-ltd.com.ua; tel. +38 (067) 524 41 05; +38 (050) 015 00 04
Project details
The current stage of project development Under development
Project description Accommodation: Dnipropetrovsk region, Vasylkivskyi district, Pavlivka. Status: private land plot. Realization: Realization by selling to the customer’s property. Land plot area: 20 ha. Land use designation: 14.01 - for the location, construction, operation and maintenance of buildings and construction of power generating facilities, institutions and organizations. Cadastral numbers: 1220787700:01:018:0044. Cost: 720 000 Euro
Project implementation period 6 months*
Available documentation Technical conditions for 12 MW; statutory documents of SPV and all related documents; agreement on connection to the electric grid and technical requirements; preliminary placement of the SPS field with the possibility of installing 12 MW
Approval Documentation Property Right to Land, Agreement on connection to the electricity grid
General Information
Expenditure on construction of additional infrastructure The connection point: substation - 35/10 kV near Pavlovka. Voltage of the connection point of is 35 kV. The connection point is located on the distance of 0.4 km (400 meters). Grid Connection Cost (GCC). The calculation was made in accordance with the new rules of connection to the national grid - 20 000 $/MW ac Pay-back period: 5 years
Date of filling 20.01.2020