Solar Power Plant Construction with capacity of 19,9 MW
General Information
Potential projects
Solar power
Location
Settlement Horodenka town
Region Ivano-Frankivsk oblast
Total capacity
electrical, kWt
Stages
19900 Kwt
І stage
heat, kWT
Stages
0 Kwt
0
The Name of a Project's Promoter (enterprise/organization)
The Name of a Project's Promoter (enterprise/organization) Multi-Solar-Horodenka LLC
The Type of promoter Commercial project
Website https://infinity-energy-inc.com
Contact details Vitalii Orobets, tel. +380 66 337-80-60; e-mail: infinity-energy-inc@ukr.net
Project details
The current stage of project development Under development
Project description The project is envisaged the construction of a solar photovoltaic power plant with a capacity of 19.9 MWh. The land plot is located in the south of the Ivano-Frankivsk region and has asphalt entrance. Infinity Energy Group - has been working in the field of renewable energy since 2013 and has extensive experience in the implementation of solar power plant construction projects
Project implementation period 6 months
Available documentation Land lease agreement for 49 years, 3% rental rate, an excerpt from the State Register of Real Property Rights, contract for non-standard connection to the electrical distribution networks, town-planning conditions and restrictions
Approval Documentation Lease of Land Plot, Agreement on connection to the electricity grid, Others
Other Technical and Financial Documentation Specifications of the non-standard connection to the grid and the turnkey cost estimate
Technology Solar Module 285 W. Fronius ECO 27-3-S; Datacommunication system; Distributors RAC. Structure (4-row) Aluminium. Other Materials and Technology (Cables, electrical material, lightning protection; Material for electrical installation; Transformer station, connection (**) - HV; VHV)
Project payback 4 years
Total investment
Euro 13141171 €
Stages I stage
General Information
Annual power production kWh/year 22667 Kwt
Expenditure on construction of additional infrastructure Cost for connecting a solar power plant is provided in the Project Presentation
Date of filling 01.10.2019